History

2008 year


  • Basic engineering is fulfilled (DB)
  • A contract was signed for the development of detailed engineering, equipment manufacturing (DB)
  • A contract was signed for the development of the project and working documentation (LLP PCO)
  • A contract was signed for manufacturing of a part of the basic technological equipment (Belkamit)

  • 2009 year


  • Detailed engineering (DB)
  • Manufacture and supply of basic equipment (DB, Belkamit)
  • Development of the project and working documentation (LLP PCO)

  • 2009-2010 year


  • Detailed engineering (DB)
  • Manufacture and supply of basic equipment (DB, Belkamit)
  • Development of the project and working documentation (LLP PCO)

  • 2011-2014 year


  • Reconstruction of the plant under the project (LLP PCO)
  • Installation and configuration of equipment (DB)

  • 2015 year


  • The plant was launched
  • First production was released

  • 2016 year


  • Output at full power